Permits and contractor registration in Cibolo
Whether your floor needs a permit is the City of Cibolo's call, made through its Building Department, (210) 658-4175. Before we start, I check with them about your job. If they say a permit is needed, we apply for it as the contractor and you get a copy. That check comes before we set a start date, because a permit and its inspections set part of the schedule.
The city also requires every contractor working in Cibolo to register with it before applying for a permit, and an application filed before registration is done gets delayed. Registration asks for the contractor's type, insurance certificates and contact details. The city tells homeowners to make sure their contractor is registered before work begins, so ask any contractor, us included, to show you.
- Cibolo permits are applied for and tracked through the city's MGO Connect portal.
- Inspections run Monday to Friday, 8 AM to 5 PM, requested through the portal.
- A permit lapses if work doesn't start within 180 days of issue.





